Ratio, Polarity & Circuit check All equipment requiring maintenance is accessible (valves, junction boxes, etc.). 7 LA Ensure the trap is filled to the correct level. TEST REPORT FOR PANEL MOUNTED VT-PRE COMMISSIONING Date Designation Location : 2. Please do not underestimate the impact your purchase can have on this site; it allows us to re-invest in more content/resources, keeping those annoying banner adverts away. QAP- LT Panel.pdf. If the unit is installed externally then ensure it can be fixed to the floor, check for internal mounting requirements with the manufacturer. Top 15 Commissioning Checklists: 1) Commissioning Checklist; 2) Pre-commissioning Control; 3) Plant Commissioning Checklist; 4) Electrical Commissioning Checklist; 5) HVAC Commissioning Checklist; and 10 more. breaker bolts (3) Alignment of breaker (4) Earthing connection (5) Gas pressure low operation (6) Checking of: 1)Valves position (on / off), 2)Gasket joints to avoid oil leakage, 3)Earthing General Ductwork Delivery, Storage, Install Checklist Template [MS Word] + [MS Excel] Here is our open copy [MS Word] of the DUCTWORK Pre-Functional Checklist, for making life a little easier. All holes are cut and available through walls. Break Isolator & Earth switch All valves/control valves are installed and in correct direction. Plenum boxes, where installed, are clean and free from damage. Pipework that is to connect to the unit has been weld tested. Commissioning Checklists: Free PDF Download | SafetyCulture | Pre contact of the breaker using continuity tester, to conform the contact is in NO /NC. d) Instantaneous E/F unit protection Insulation Resistance (P-E) The GC (CM) shall maintain a parallel field copy of the Commissioning Plan. All connections, pipework/ductwork, etc., can be independently supported and not supported by the unit. Ensure all gaskets are installed and sealed. Pharmaguideline is a pharmaceutical blog where pharmaceutical concepts are explained in very simple and easily understandable language for professionals and students. 1) Insulation resistance test (between all terminals and body, between various ciruits) There is enough space allowed around and above the unit once installed to perform maintenance, and remove components. The bracketry is ready and can bear the weight of the installation and has been spaced correctly. The room/area is dry and watertight. INSULATION RESISTANCE TEST Fan, blades, and motors are clean and dust-free. MAGNETIZATION CURRENT TEST DIFFERENTIAL (Numerical) Relay (87 T) Condensate pipework is installed [see condensate section]. 5.0 PROCEDURE 5.1 For Putting ON the Panel 5.1.1 Ensure breaker in its position inside the panel. The checklists are provided in Microsoft Word and Excel. stresses due to short circuit of bus bar. The materials used between the equipment and the chilled water system will not cause Electrolysis. C&R Panel15 The flanges and frames of the ductwork are undamaged. Contact Resistance Test Checking of: 1)Valves position (on / off), 2)Gasket joints to avoid oil leakage, 3)Earthing 15. [Dont forget that if the unit is mounted outside the surface will need to be hard and flat]. The objective of this document is to provide a structure for the, commissioning of the HT electrical services included within the sub-, Below Indian standard were referred to prepare this document, Do not sell or share my personal information. A union is provided ahead of each screwed valve, trap, or strainer, and on each side of each piece of equipment and whatever needed to dismantle piping. VOLTAGE RATIO & TAP CONTINUITY TEST CONFIRMITY TEST (1) Visual external damage to any part of the transformer (2) Bucholz alaram + trip All holes are cut and available through floors for risers. Any damage noted should be reported to the manufacturer/supplier within 3 days in writing, supported with photographs. CONTINUITY TEST The area is well ventilated and has no risk of high humidity. Ensure is protected from any frost with insulation and/or heating cable. 12 HT CABLES Coordinate with Section 01810 Fundamental Commissioning Requirements to utilize these checklists. 5.1.3 Check incoming voltage between R-Y, Y-B & B-R on the voltmeter provided, it should be 10.5 to 11KV. QAP- LT Panel.pdf. The installation of the unit will not impede the installation of the condensate trap/pipework. Plenum boxes, where required, are insulated. Bushings are not allowed. Check that the humidity sensor is calibrated. Filters have the correct sealing gaskets installed. Roof canopy, if being used, is installed and fixed. Pipework surfaces are clean and not scratched. Weather louver installed with correct mesh. 7) Restricted E/F Protection (HT Side) Winding Resistance Test The system is charged with the correct amount of refrigerant. Comments shall be published after review. MAGNETIZATION CURRENT TEST are insulated. Power is available to the electric heater/control panel for operation. a) Time Current characteristics tests for O/C unit Aux. All ancillaries will be placed in a safe and secure location, so items do not go missing or get damaged. . 13. . So get an MS Word & MS Excel for the same price. LBS If fire dampers were installed as per the drawings, confirm that they have been tested in line with the project requirements. Advertisement. Any connections between copper and steel pipes are made with dielectric fittings. Freezing safety interlocks installed as per the design. The surface where the pipework is to be placed is flat. Any damage that is noted should be reported to the manufacturer/supplier immediately in writing supported with photographs. Correct commissioning is vital to the satisfactory operation of any plant or facility. the circuit breaker is operating properly. Prior to the ducting being installed the following should be checked. Magnetization characteristic check All electrical cabling is labeled in line with the project naming convention. Please do not underestimate the impact your purchase can have on this site; it allows us to re-invest in more content/resources, keeping those annoying banner adverts away. 2) General Checks:- Inspection for physical damage, wiring check, Resetting of LEDs with cover All volume control dampers are installed as per construction drawings. The room/area the pipework will be installed into is clean and dust-free. MULTIFUNCTION RELAYS 8) Restricted E/F Protection (LV Side) caleb isukuru. Panel Check List | PDF | Power Supply | Alternating Current - Scribd There is a trap installed and is installed in line with manufacturers requirements. System has been filled and bled with air removed. Job Procedure 01 For HT PANELS. The labels on the ductwork sections and technical details/sizes match the purchase order and drawing. 18 PLCC,Wavetrap Checking of connections, earthing Unit and components are fully earthed in line with the manufacturers instructions. A copy of the order that was sent to the supplier is available for reference and is being used to check against, The ductwork, flexible ducting, grilles/louvers and dampers are packaged, protected, for maximum protection. breaker bolts (3) Alignment of breaker (4) Earthing connection (5) Gas pressure low operation (6) 4. Seismic restraints, where required, installed. Editable Pharmaceutical Documents in MS-Word Format. Fan/motor rotates in the correct direction with no obstructions [by hand], Fan/motor rotates in the correct direction with no obstructions [electrically bump unit on]. Ensure any bypass dampers can operate correctly and are not obstructed. Plenum has drain installed with trap to remove any unwanted ingress of water, Plenum has access hatch/s installed to allow future maintenance and inspections, All fresh air ductwork is installed, correct size, and connected to the unit with correct fixings. silica gel/Oil level/leakage, if any (7) Abnormality, if any. 6 The checklists are provided in Microsoft Word and Excel. Repair / replace damaged components, if any. Bag filters are installed, clean, and are of the correct grade. c) Time Current characteristics tests for E/F unit TNR Gold Investor Presentation - Building The Green Energy Metals Royalty and UPS & Battery Checking of connections, physical damage, voltage at output terminals If there is dust/construction work, then the ducting should be protected, ends capped. Piping is installed in a manner to ensure that insulation will not contact adjacent surfaces. So get MS Word & MS Excel for the same price. You can ask questions related to this post here. This General Pipework checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including all equipment and ancillaries related to the pipework system, the full functional testing/commissioning can be conducted. All medium pressure branch and tee connections are expanded 30 degrees on at least three sides. of 1 Checklist For HT Panels & Transmission Lines Date 06-Oct-20 Site 5.5MW Budak, Hisar Location Hisar,Haryana S.No Description Remarks 1 Check the Condition of Panel Physicall OK 2 Check for the working of all the indicators and alarms Working 3 Check for the function of relays REF615F Relay display are Not Working All square elbows and radius elbows larger than 18 inches [460mm] have turning vanes. This checklist should be used and completed throughout the project, and its different stages, delivery, storage, installation & pre-commissioning, before the functional testing occurs. The heating water system has been hydraulically balanced. Pipework that is to connect to the unit has been pressure tested. All original packaging is intact and not removed. Ensure is unobstructed and can be removed for maintenance/cleaning. Abnormality, if any 7) test for leakage of air / gas Pre-Commissioning Check List | PDF - Scribd All wall and floor penetrations are sealed, and the fire stopped where required. Opretional Checks (1) Mechanical Check (2) Electrical Check (the operating mechanism of the 3 poles All cabling is installed and connected on the correct containment/raceways and not damaged. Precommissioning Checklist | PDF | Transmission (Mechanics) | Valve In addition, some spare space is kept for future, installations of switch cabinets in each section, Do not sell or share my personal information. Commissioning Report for HT - [PDF Document] All pressure gauges installed, and display scale as per design requirements. Some typical electrical pre-commissioning testing includes: Grounding and bonding checks- confirm the integrity of the ground system and bonding system by measuring the resistance of bonds to ensure bonding to all metallic surfaces is in place.Cold loop checks and megger checks- confirm that all cable and conductors are terminated to the correct . Pre-commissioning, Commissioning, and Startup Safely HSSE WORLD The maximum length of flexible ductwork is 5 feet [1700m]. . Counter Test A variable speed drive has been installed. [if the unit is not rated for external use]. All safety components are connected and operational including all thermostats to cut power to the heater if needed. Checking of Interlocks (mechanical and electrical) The area being installed is not prone to flooding or ponding of water. Pipework has been internally flushed, cleaned and chemically treated. Check to ensure that all connection kits containing - gaskets, bolts, are available to allow bolting up of the pipework. use this checklist to easily inspect control systems, wiring, sensors, field control devices, and the site communications network. 5. SS04 CH01 - 48V BDT Transducer SAT Format . 4, NUMERICAL Relay The room/area the ducting will be installed into is clean and dust-free. Any changes in pipe sizes are made with the proper size reducing fittings, reducing fittings, reducing elbow, or reducing tees. 0 515 010 358 -- Quartz Clock-Engine Hour Meter Installation. If you would like to know more about the author, here is my Personal Linkedin Account, ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | 2023 constructandcommission.com. Battery, Battery charger & A pre-commissioning checklist aims to prepare a manufacturing plant for start-up, or when all new or modified systems are going live. 1.4 LVMDP and LVSDP Electrical Panels. All extract air ductwork is installed, correct size, and connected to the unit with correct fixings. Check to ensure that all connection kits containing - gaskets, bolts, are available to allow bolting up of the pipework. Ensure the fan wheel is centered on the intake section. INSULATION RESISTANCE TEST Panels. 14 EARTHING Once the ducting has been installed and prior to the functional testing and commissioning phase taking place the following will be checked. CVT10, Capacitance measure of capacitor section Each P.T. Pre-Commissioning Tests for AC Side of Solar Power Plant. PHYSICAL CHECKING OF LAYING & TERMINATION Dewatering pump checklist (1) Dewatering pump checklist (1) MD Abdullah . To fill a pipeline, APS uses a specialty tool called a "fill pig.". The materials used between the equipment and the heating water system will not cause Electrolysis. This test can be used to. Before the units are placed into storage, the following should be checked. 3) Coil Pick up & drop off test Ductwork insulated and vapor seal in line with the specification. All transverse and longitudinal joints are sealed. DCDB 11 KV HT PANELS, RMU The area is well ventilated and has no risk of high humidity. Area being installed is not prone to flooding or ponding of water. Ensure any pressure and temperature sensors are calibrated. Humidifier internals is clean and clear of debris. PDF Commissioning System File - Elsevier Pipeline Pre-Commissioning Checklist | APS - American Pipeline Solutions All valves fitted and operating [isolation, non-return]. Pipework does not put undue stress on equipment, where connected and is bracketed to support itself. Units will not have materials stacked on them. All fittings and ancillaries are rated correctly and inline with the pressure of the system. This ventilation ductwork checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including all equipment and ancillaries related to the ventilation system, the full functional testing/commissioning can be conducted. We have created this bundle to consolidate all the Equipment Pre-Commissioning and Maintenance Checklists that are available across the site. Bracketry, if ordered, is included in the delivery. Winding Resistance Test All doors can be fully opened to gain access to the unit. Step 1 - Planning. Piping does not block access to equipment that is part of this system or another system (e.g., air terminal units). HT COMMISSIONING 2 1.0 Purpose: . 1. INSULATION RESISTANCE TEST PI TEST Flexible ductwork does not have 90-degree bends. INVERTER TRANSFORMER2 Winding Resistance Test Standard operating procedure to operate the high tension panel. Electrical Panel Inspection Checklist Free Template D04. Flexible ductwork is installed using extra heavy flexible duct straps. All drawings have been updated to reflect any changes made. 1) Seconday Injection Test (according to service setting of relay) WINDING RESISTANCE (LV SIDE) AT ALL TAPS Operation and startup manual for the AHU available. shall be well synchronized) All attenuators are installed as shown on the drawings. If the unit is mounted at a high level, confirm that there is a safe manner to remove the parts and components and that there is enough space at a high level and at the floor level to allow this. Soumik Kar. Volume dampers, grilles, terminal units, etc are provided and installed as per the ventilation drawings. Please don't spam. The installation of the pipework will not put stress on the equipment connections or create vibrations. The materials used between the equipment and the refrigeration pipework system will not cause Electrolysis. Maintenance & General check-ups (1) Inspection for physical damage (2) Cleaning & tightness of bolts Leak Test Checklist and Procedures ; 12. Instruments, flow meters, energy meters, and commissioning stations have been installed in line with the manufacturer's requirements and correct direction. PI TEST Commissioning Report For HT | PDF - Scribd Grilles and diffusers, where required, have dampers for volume control. This checklist should be used and completed throughout the project, and its different stages, delivery, storage, installation & pre-commissioning, before the functional testing occurs. TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. Those executing the checklists shall perform only items that apply to the specific application at hand. All ancillaries are included in delivery as per the order and delivery note, Replace any protection that has been removed. Checking of connections, physical damage, voltage at output terminals The Commissioning Process: A Step-by-Step Guide PI TEST contacts, Flag operation and resetting of flags with cover INSULATION RESISTANCE TEST If the equipment is to be placed into storage on site before installation, an inspection will be completed checking the following. The checklists are provided in Microsoft Word and Excel. PHYSICAL CHECKING OF VARIOUS ELECTRICAL & MECHANICAL PARTS STERLING & WILSON LTD HT COMMISSIONING. Supplier's consolidated delivery ticket is available, showing all equipment and ancillaries for inspection and being used to check against. Panel Check List Uploaded by Satheesh Kumar Description: Electrical Instrumentation - Panel Check List Copyright: Attribution Non-Commercial (BY-NC) Available Formats Download as PDF, TXT or read online from Scribd Flag for inappropriate content Download now of 6 PLC Panel Check List Over all system cofiguration checks Pass Fail Comments Pre-commissioning checklist - PDF Template - DataScope 11. IR TEST (P - E, S- E, P - S, S -S) Check that all required cabling can be run through the unit and on appropriate containment. PT All ductwork except as noted in the specification is leak tested. Once all project commissioning activities are complete including the resolution of issues, the Commissioning shall transmit Authoritythe completed The chilled water system has been hydraulically balanced. Pipework is installed in line with the project drawings [size, location]. Test holes available in the duct to allow air readings. All components upstream of the filter are clean and dust-free. The room/area the pipework will be installed into is clean and dust-free. All ancillaries will be placed in a safe and secure location, so items do not go missing or get damaged. All hat sections and standoff brackets are at the same height as the duct lining. Ductwork is clearly labeled in line with project requirements. Flexible ductwork is clean and free from damage. electrical_commissioning_checklist_non_leed. 1) Insulation resistance test (between all terminals and body, between various ciruits) Interlock Check procedures . OLTC operational test Seismic restraints, where required, installed. WINDING RESISTANCE (HV SIDE) AT ALL TAPS What is Pre-Commissioning ? Pre-Commissioning Checklist Contact Resistance Test Flexible ducting is fixed with the correct methods to the ducting and grille boxes etc. Ensure the drain pan is clean and free of debris, Operation of the heating coil is fan controlled/interlocked. AIR HANDLING UNIT | Pre-Commissioning Inspection Checklists The plinth/base is ready, flat, and level & can bear the weight of the installation. Checking of interpanel wiring, protection relays, terminal block contacts, earthing Proposed Changes to the IAASB Going Concern Standard Overview of Key Changes. Bob Moore Farms_Due Diligence Presentation_6.14.23.pptx. If there is dust/construction work then the unit should be protected. MAGNETIC BALANCE TEST DOC Commissioning - M&E Prefunctional Checklists - Los Angeles baseline for future operation and maintenance. MAGNETIZATION CURRENT TEST Timing Test (1) Open time (2) Close time IR test between Control, CT, PT circuits & earth Pre- commissioning for HT panel 22 KV - YouTube 9.4 Type, Routine, Acceptance and Pre-comissioning Tests 161 9.5 High Voltage Equipment Test Techniques 162 9.6 Commissioning Procedures 163 10 Interface to Control Equipment (PLCs) 165 10.1 Overview of PLC 165 10.2 PLC I/O Modules 167 10.3 Pre-Commissioning Tests 170 10.4 Commissioning Procedures 171 10.5 Typical Faults 173 Timing Test (1) Open time (2) Close time Ensure that all bolts are installed as per manufacturer's instructions. 1. Job Procedure 01 For HT PANELS. Contact Resistance Test Weather louver/roof cowl installed and weather tight with relevant mesh and is unobstructed. Coil resistance test (1) Closing coil (2) Tripping coil-1 (3) Tripping coil-2 (4) Motor winding Prior to the ductwork being placed into storage, the following should be checked. documentation, for insertion in the master Commissioning Plan, which will be held by the Commissioning Authority. Coldwater feed is connected to the humidifier standalone unit. Manual checking of operation (close or open) by Handle Plenum installed connecting the louver to the ducting. 6. COMMISSIONING CHECKLISTS | The 3 Types Explained And Templates Listed Prior to the pipework being installed the following should be checked. We observe the operation of circuit breaker opening. The cooling coil is clean, in good condition, and the fins undamaged. Commissioning of HT Panel - Operational and Functional Checkup - EEP A local motor control panel [LMCP] has been installed, The local motor control panel has been electrically tested. The area is well ventilated and no risk of high humidity. Pre-commissioning Procedure for Motor Control Center Ensure that the Motor Control Center installation is complete and all electrical & mechanical comments on installation ITRs are completed & approved. The area is secure and protected from the movement of other materials and vehicles. PHYSICAL CHECKING OF CONNECTIONS General checks 1) Inspection for physical damage 2) Continuity check for ammeter and/or relay circuits 5.3.1 HT Switchgear & panel (i) Insulation Resistance Test The Insulation-resistance shall be taken with all the winding earthed, expect, the one being tested. All supply air ductwork is installed, correct size, and connected to the unit with correct fixings. contacts (3) WTI & OTI alaram + trip contacts (4) MOG contacts (5) Phase Sequence Check (6) colour of Variable Speed Drive [VSD] has been electrically tested, Variable speed drive has been functionally tested. The next phase of pre-commissioning procedures begins with preparing the pipeline for testing. 4. Access doors are installed in all casing, plenums, ductwork adjacent to fire dampers, automatic dampers, smoke dampers, and reheat coils, and as indicated on drawings. BDV TEST OF TRANSFORMER OIL These checklists do not take the place of the manufacturer's recommended checkout and start-up procedures or report. The room/area the unit will be installed into is clean and dust-free. MAGNETIC BALANCE TEST Once the pipework has been installed and prior to the functional testing and commissioning phase taking place, the following will be checked. 13 Pre-Commissioning Checklists - Commissioning Training Center PRE COMMISSIONING CHECKLIST All points below must be answered. 11 INSULATORS HIGH VOLTAGE TEST General checks 1) Inspection for physical damage 2) Continuity check for ammeter and/or relay circuits Checking of mechanical interlok between Isolator & Earth switch (if the model is Isolator with Earth Any nipples installed are made of the same material as the pipe. 4) General Check:- Inspection for physical damage, wiring check of relay, cleaning & pressure of relay All pipework/condensate is connected to the drain [see condensate section]. Grilles and diffusers, where installed, are clean and free from damage. CONTINUITY TEST The pipework will be raised from the floor to allow airflow and stop risk of water ingress. (3) Earthing connection (4) Abnormality, if any circuits All branch and tee connections are at 45 degrees. Pre-commissioning or Commissioning Activities - Inst Tools CONTINUITY & CONTROL CIRCUIT CHECK The ductwork is clean and free of damage prior to installation. The system has been bled and air removed. 5.3 Outline of tests to be performed: . The most important pre-commissioning tests and in-service checks of protection system can be summarized as follows: Analysis of the wiring diagrams to confirm the polarity of connections, positive and negative-sequence rotation, etc.